Who keeps the margin on US metallurgical coal. Q3 2026, built only from company filings. Now covers Peabody, Coronado and Whitehaven as well.

$248.1Q3 2026 average PLV, $/tonne (Coronado, ASX). Q2: $238.3
$24.42Cash margin gap per short ton, best to worst of the four US producers (Warrior vs AMR)
64% vs 53%Share of PLV realized, Warrior vs the lowest US producer
$2.38Peabody seaborne met margin per ton (Peabody-defined costs), Q3 2026

1. Price minus cost, per ton

Realized price less cash cost, $ per short ton, Q3 2026. The yellow part is what the company kept.

Cash costMarginWarrior Met CoalWarrior Met Coal: realized $143.56, cash cost $104.98, margin $38.58 per short ton (Net selling price, at port). Source S4$105$38.58CNR, metCore Natural Resources (met segment): realized $120.18, cash cost $92.92, margin $27.26 per short ton (Met segment average, includes some thermal). Source S3$93$27.26RamacoRamaco: realized $120.00, cash cost $104.00, margin $16.00 per short ton (FOB mine). Source S2$104$16.00AMR, metAlpha Metallurgical (met segment): realized $121.09, cash cost $106.93, margin $14.16 per short ton (Met segment average, includes some thermal). Source S1$107$14.16BTU, sea. metPeabody, seaborne met: realized $164.83, cash cost $162.45, margin $2.38 per short ton (Seaborne Metallurgical segment, Australia. Peabody-defined revenue and costs per ton. Quarterly unit not stated, short tons assumed). Source S7$162$2.38
ProducerRealized $/stCash cost $/stMargin $/st% of PLVBreak-even PLVBasisSrc
Warrior Met Coal (HCC)143.56104.9838.5863.8%~$181Net selling price, at portS4
Core Natural Resources (met segment) (CNR)120.1892.9227.2653.4%~$192Met segment average, includes some thermalS3
Ramaco (METC)120.00104.0016.0053.3%~$215FOB mineS2
Alpha Metallurgical (met segment) (AMR)121.09106.9314.1653.8%~$219Met segment average, includes some thermalS1
Peabody, seaborne met (BTU)164.83162.452.3873.2%~$245Seaborne Metallurgical segment, Australia. Peabody-defined revenue and costs per ton. Quarterly unit not stated, short tons assumedS7

Definitions differ: Warrior reports at the port, Ramaco at the mine, AMR and CNR report segment averages that include some thermal coal, and Peabody reports its own revenue and cost per ton for a segment mined in Australia, with the unit not stated in the quarterly table (we assume short tons). Treat the ranking as a strong hint, not a stopwatch.

2. Coronado and Whitehaven: different yardsticks

Coronado and Whitehaven do not report a cash cost that lines up with the table above (Coronado reports mining cost per tonne produced, Whitehaven reports one A$ cost for all its coal, met and thermal). We show what they disclose and do not compute a margin.

CompanyItemDisclosedSrc
CoronadoRealized met price, group / Australia / USUS$183.5 / 186.3 / 177.0 per tonneS5
CoronadoShare of PLV: group / Australia / US74.0% / 75.1% / 71.3%S5
CoronadoMining cash cost per tonne produced, group / Australia / USUS$112.8 / 104.4 / 142.4S5
WhitehavenQueensland met realized priceUS$184 per tonne, 74% of PLVS6
WhitehavenAverage achieved price, all coal (met + thermal)A$226/t (Queensland A$257, NSW A$198)S6
WhitehavenUnit cost of coal, all coal, excluding royaltiesLow end of FY27 guide of A$132 to A$147/tS6

Two primary sources agree on the quarter's PLV average: Coronado shows US$248.1/t and Whitehaven shows US$248/t.

3. Same index, different share of it

Realized price converted to metric tonnes, divided by the Q3 PLV average of $248.1. Part of the gap is grade mix: Warrior sells mostly low-vol, AMR and Ramaco more high-vol, and the Australian-origin producers sit higher.

100% of PLVCoronado Australia*Coronado Australia*: 75.1% of the Q3 PLV average of $248.1. Source S575.1%Whitehaven QLD met*Whitehaven QLD met*: 74.0% of the Q3 PLV average of $248.1. Source S674.0%BTU, sea. metBTU, sea. met: 73.2% of the Q3 PLV average of $248.1. Source S773.2%Coronado US*Coronado US*: 71.3% of the Q3 PLV average of $248.1. Source S571.3%Warrior Met CoalWarrior Met Coal: 63.8% of the Q3 PLV average of $248.1. Source S463.8%AMR, metAMR, met: 53.8% of the Q3 PLV average of $248.1. Source S153.8%CNR, metCNR, met: 53.4% of the Q3 PLV average of $248.1. Source S353.4%RamacoRamaco: 53.3% of the Q3 PLV average of $248.1. Source S253.3%

*Hatched bars: the company's own stated figure on a metric basis (Coronado S5, Whitehaven S6). Solid bars: our calculation. Peabody (BTU) mixes Australian-origin coal and is a different mix from the US-origin producers, so the gap is partly grade and origin, not only pricing.

4. How far can PLV fall?

Break-even PLV = Q3 cash cost x $248.1 / Q3 realized price, holding each producer's realization ratio constant. An illustration, not a forecast.

$180$200$220$240$260Q3 PLV $248Warrior Met CoalWarrior Met Coal: break-even PLV about $181 (cash cost x PLV / realized). Cushion about $67$181cushion about $67CNR, metCore Natural Resources (met segment): break-even PLV about $192 (cash cost x PLV / realized). Cushion about $56$192cushion about $56RamacoRamaco: break-even PLV about $215 (cash cost x PLV / realized). Cushion about $33$215cushion about $33AMR, metAlpha Metallurgical (met segment): break-even PLV about $219 (cash cost x PLV / realized). Cushion about $29$219cushion about $29BTU, sea. metPeabody, seaborne met: break-even PLV about $245 (cash cost x PLV / realized). Cushion about $4$245cushion about $4

Margin per ton as PLV moves

Cash margin, $ per short ton, at PLV of$200$225$248.1 (Q3)$275$300
Warrior Met Coal10.725.238.654.168.6
CNR, met4.016.127.340.352.4
Ramaco-7.34.816.029.041.1
AMR, met-9.32.914.227.339.5
BTU, sea. met-29.6-13.02.420.336.9

Ignores fixed-price commitments, lags, freight and cost changes.

5. What the companies guided

CompanyItemGuidanceChange / contextSrc
AMR2027 cost of coal sales$104 to $110 /stQ3 actual $106.93S1
AMR2027 met shipments13.1 to 14.1 MtS1
AMR2027 capex$145 to $165MS1
METC2026 cash cost$101 to $103 /straised from $96 to $99S2
METC2026 production3.5 to 3.6 Mtcut from 3.6 to 3.9 MtS2
CNR2026 met cash cost$88 to $90 /stQ3 actual $92.92S3
HCC2026 cash cost$95 to $105 /streaffirmedS4
HCC2026 sales13.0 to 14.0 MstreaffirmedS4
CRN2026 saleable production14.0 to 14.5 Mtcut from 16 to 17 MtS5
BTUQ4 2026 seaborne met volume and cost2.2 to 2.4 Mt, $150 to $160 /st, ~70% of PLVQ3 cost $162.45S7
BTU2026 seaborne met volume and cost8.9 to 9.1 Mst, $150 to $155 /stvolume cut 0.6 Mt, cost up ~$15S7
CRN2026 mining cash cost per tonne producedUS$105 to $110 /traised from $88 to $96S5
CRN2026 capexUS$150 to $175MunchangedS5
WHCFY27 unit cost of coal (ex royalties)A$132 to $147 /tQ1 at the low endS6

6. Cash and balance sheet

CompanyItemDetailSrc
HCCSpecial dividend $2.00/sharePayable 20 Nov 2026 (record 9 Nov)S4
CNRQ3 buybacks $84.7M$586.1M authorization remaining. $0.10/share dividend, record 30 Nov, payable 15 DecS3
AMRBuybacks $39.7M in nine monthsCumulative about 7.1M shares for about $1.2B to 31 Oct 2026S1
METCNo buyback or dividend stated in the release excerpt readNet loss $18.2M, cash $233.0MS2
BTUQuarterly dividend $0.075/shareRecord 19 Nov, payable 9 Dec 2026. Cash $434.3M at 30 SepS7
BTURetired $38.9M of 2028 convertible notes for $58.1M cash in Q3Remaining $39.9M called for redemption in Nov 2026, any conversion settled in cashS7
CRNNet debt US$553.1M, liquidity US$155.0MNet debt down from $606.1M at 30 JunS5
WHCNet debt about A$1.4B at 30 Sep 2026Rose by about A$0.1B in the quarterS6

7. What is coming

DateEventSrc
9 Nov 2026HCC special dividend record date (passed)S4
20 Nov 2026HCC $2.00/share special dividend payableS4
30 Nov 2026CNR $0.10/share dividend record date (payable 15 Dec)S3
Late Nov 2026Coronado Buchanan longwall move; Warrior has one longwall move left in Q4S5, S4
Early Dec 2026Ramaco initial 2027 guidance after its Board meeting (date not found)S2
Q4 resultsDates not found for AMR, HCC, CNR, METC. Not guessed
19 Nov 2026BTU $0.075/share dividend record date (payable 9 Dec)S7
Nov 2026BTU redeems remaining $39.9M of 2028 convertible notesS7

Sources (all retrieved 2026-11-16):

IDSourceDateType
S1AMR Form 8-K Ex.99, SEC EDGAR6 Nov 2026Primary
S2Ramaco Form 8-K Ex.99.1, SEC EDGAR3 Nov 2026Primary
S3Core Natural Resources Q3 2026 release (wire republication)5 Nov 2026Primary text, cross-check on IR/EDGAR
S4Warrior Met Coal Q3 2026 release (wire republication)4 Nov 2026Primary text, cross-check on IR/EDGAR
S5Coronado September-quarter report, ASX22 Oct 2026Primary
S6Whitehaven Coal September 2026 Quarterly Production Report, ASX23 Oct 2026Primary
S7Peabody Q3 2026 release (PR Newswire republication)4 Nov 2026Primary text, cross-check on Peabody IR

S3, S4 and S7 are wire republications of company releases and should be cross-checked on the company IR pages or EDGAR before this goes public.

Disclosure: Author owns AMR, HCC, CNR and METC.

Anthracite is for information and discussion only. It is not investment advice, a recommendation, or an offer to buy or sell any security. Scenario tables are illustrations, not forecasts or price targets.

Want the story behind these numbers?

The Anthracite newsletter walks through what the dashboard shows, what would change our mind, and what to watch next quarter. Paid subscribers get the full analysis.

Prefer a link? Subscribe on Substack. Free subscribers get the free posts. Paid subscribers get the full analysis.